El-Mor carried out the work on the electricity, lighting and very low voltage systems, using the most advanced technologies and standards, in the following projects:
- Beersheba Stadium
- Petah Tikva Stadium
- Tel Aviv Arena
- Holon ‘Toto’ Center
We implemented the following systems in these projects:
- Advanced lighting systems in accordance with strict FIFA and FIBA standards
- Peripheral lighting system MV work: transformers, switchgears, bus-bars
- Low voltage work
- Manufacturing and installing electrical switchboards of up to 4,000 amps
- Installing metal trays, ladders and conduits
- Laying, terminating and connecting MV & LV cables
- Installing generator-sets with automatic switching capabilities
- Grounding and lightning protection
- Very low voltage systems – monitoring, access control, PA and firefighting system
- The work was carried out during: 20013-2015